| Project Name | Max test load(kN) | Pile Diameter(M) | Quantity(NO.) |
|---|---|---|---|
|
Lanzhou Yuanseng the Yellow River Bridge, China* |
28000/9000 |
1.8/1.5 |
3 |
|
Lanzhou Gansu small West Lake overpass, China |
11000 |
1.2/1.5/1.2 |
3 |
|
Railway of Lanzhou to Zhongchuan Airport, China* |
25000 |
1.25 |
3 |
|
Gansu Gymnasium, China |
14000 |
0.8 |
6 |
|
Tianshui Luojia Bridge, China |
20000/25000 |
2/2.5 |
3 |
|
Hong Kong-Zhuhai-Macao Bridge, China |
140000/110000 |
2.0/1.8 |
4 |
|
Wuchuang Futong City,Zhanjiang Guangdong, China |
10000 |
1 |
6 |
|
Diwang International Fortune Center,Liuzhou, China |
70000 |
2.2 |
3 |
|
Meteorological disaster warning and emergency center,Jiangsu, China |
4500/17000 |
0.7/0.9 |
2 |
|
New Su Center,Jiangsu, China |
10000 |
0.8/1.2 |
12 |
|
1st Subway Line of Wuxi,Jiangsu, China* |
26000 |
2 |
4 |
|
Zhengzhou-Xuzhou Passenger dedicated line,Jiangsu, China |
8000 |
1 |
4 |
|
Gongan County Menghua Railway,Hubei, China* |
8000 |
1 |
2 |
|
Jiayu Yangtze River Highway Bridge,Hubei, China |
42000/56000 |
2/2.5 |
3 |
|
Jinzhou Coal Base,Hubei, China |
15000 |
1 |
2 |
|
Hanyi High-speed Rail Bridge,Hubei, China |
8000 |
1 |
3 |
|
S107 Provincial Rd Bridge,Hubei, China |
8000 |
1 |
3 |
|
K11 Part of Hongshan Country,Hubei, China |
14000 |
1 |
9 |
|
12th Bid of Line7 Wuhan Metro,Hubei, China |
9600 |
1.2 |
3 |
|
Coal Dock of Baihushan Harbour District,Hubei, China |
10000 |
1.2 |
2 |
Remark: The project with* is working pile.
Ougan Technology Co., Ltd,-Copyright© 2008-2019
浙ICP备10000181号
33011802000764号 技术支持:杭州故乡人网络
bi-directional load test pile load test load cell pile capacity test Foundation Equipment Division